Decontamination Work at Alcanada Plant

The Consell de Mallorca is inviting companies to submit their tender for the project and the direction of the decontamination works of the old thermal power station of Alcanada. Interested companies have  until March 5 to submit their projects, following the technical specifications that have been published.

This tender process will allow for essential work to be carried out for the environmental and heritage recovery of the site, which has been declared a site of cultural interest (BIC). The Minister of the Presidency, Antoni Fuster, has stressed that “this progress represents the beginning of a new phase for the Alcanada thermal power station. These are the first real actions aimed at its decontamination and at guaranteeing the viability of a new project.

The decontamination of the old thermal power station is highly complex and will allow compliance with the legal and environmental standards required for the recovery of the environment. The project is co-financed by the European Just Transition Fund (FTJ) (to find out what that is click here).

Interested companies can consult all the necessary information and documentation through the following link: access to the contracting portal. This process will guarantee the selection of the best proposal to carry out a quality intervention, respectful of the environment and aligned with the criteria of sustainability and heritage conservation.

Translate
Scroll to Top